The SCWA writes on 4/16/2002: In response to your questions in your
e-mail, I offer the following:
1. The RFP hasn't been prepared as yet. The Town, as the Water
Commissioners, is gathering information concerning the project, including
a ballpark estimate. They will be holding a public hearing.
2. The capacity for fire fighting of the system, after replacement, will
be dramatically improved.
3. The Authority has installed an automatic emergency connection at the
east end of the system. There is an existing manual interconnection to the
Saltaire Community on the west side.
4. The Town and the Authority are talking about the replacement of walks.
While nothing is settled, there is a possibility that the Town Highway
Department would pay for the walks and therefore, that cost would not be
apart of the water main replacement project. |